After one year of uninterrupted operation, the 12-months test on the world’s first 1 MW power plant – for the production of steam for industrial process and powered by four 250 kW E-Cat modules – was concluded on February 17, 2016 at 12 a.m.

Andrea Rossi said that, for the results, we should wait the report that will be delivered by the third party entity which performed the measurements on the system during the period of operation. But, if the results will be positive, this date will be remembered, because it will put the bases to the use of a new form of low-cost, clean and safe energy: a kind of “New Fire” for humanity.

photo 5 c

Andrea Rossi while flying on a private jet during one of his many business trips.

Thanks Andrea for your tenacity and for being able to show the world a new direction!


Accorn2Dear readers,
we are now close to the end of the 1-year long test regarding the Andrea Rossi’s 1 MW E-Cat reactor. So, there is a growing interest for those following this story from the beginning on what the final result will be, and especially on the data that will be released by the involved parties.

Although many people (including me) have tried to inform all those who would have interest in a so big scientific discovery and technological revolution – including scientific and/or political institutions – the news has been shamefully ignored on mainstream media.

I ask you to spread the video below, created by Prof. Neri Accornero (University “La Sapienza”, Italy, see his CV in Italian here), to as many people as possible in order to break the wall of silence interposed by those who have a vested interest because it does not happen.

Vessela